User's Manual

BDA TEST AND INSTALLATION PROCEDURE
1. INSPECTION
CAUTION: A minimum separation distance of 20
centimeters between the transmit antenna and
nearby persons must be maintained. If this
separation distance is not maintained, the device
may not be in compliance with FCC RF Exposure
rules.
Open the enclosure of the bi-directional amplifier (BDA) and carefully inspect the inside
assembly of the unit.
Verify that all components are properly secured to the base of enclosure, there are no
loose parts, and all interconnections are reliable. Carefully close the enclosure.
Unpack the outdoor and indoor antennas and inspect the content. Verify that there are no
loose parts or rattling in the antennas. Make sure that antennas are not deformed.
2. SITE INSTALLATION
2.1 "Donor" (outdoor) Antenna Installation
On the roof of the building chose the location of the "donor" Yagi antenna. Point the
antenna towards the "donor" site. Connect the mobile phone or spectrum analyzer to the
antenna using short cable with type "N" connector on the antenna side and proper adapter
on the test equipment side. Adjust the position of the antenna for the maximum reading.
The average power level should not be below -85 dBm. Record the measured data. Install
the antenna following instructions of the antenna manufacturer.
CAUTION: A minimum separation distance of 20
centimeters between the transmit antenna and
nearby persons must be maintained. If this
separation distance is not maintained, the devicemay
not be in compliance with FCC RF Exposure rules.
CAUTION
Use caution working with the bi-directional amplifier.
Disconnect the 115 VAC from the amplifier prior to
inspection.

Summary of content (4 pages)