Setup guide

22
6. Attach one end of the cable to the edit display controller cable
header and the other end to the Meridien digital media board set
cable header. Align the cable in the connectors; each end of the
cable is keyed for proper installation.
c
Make sure the cable is firmly seated in the connector without
forcing an improper connection.
7. Replace the cover according to the manufacturer’s documentation.
n
After removing the TARGA 2000 board set from the system, return the board
set to Avid. If you do not return the board set within 30 days, you will be
invoiced for the value of the board set.
Installing Optional Boards
Optional boards you have purchased can be installed during this
upgrade. Optional boards include:
Ultra 160 LVD SCSI controller
Fibre Channel board playback device
Gigabit Ethernet to playback device
MIDI board (Compaq Professional Workstation AP500 only)
The IBM IntelliStation Z Pro 6866 system has a built-in MIDI
controller.
c
The optional Serial Data Transport Interface (SDTI) adapter board
must be installed after NewsCutter Release 2.x is functioning.
Instructions for installing the board are provided with the SDTI kit.
Use Tab le 2 or Tabl e 3 to identify the PCI slot to install your optional
boards.
0474101A.fm Page 22 Thursday, December 14, 2000 4:25 PM