User guide

Index 7
inserting the drive 4-27
installing the Fan
Assembly 4-23
installing the power
supply 4-21
installing the RA4000
Controller 4-12, 4-14
installing the redundant power
supply 5-3
latching the drive into
place 4-27
opening the drive tray
latches 4-26
Power and Fault LEDs on the
Storage Hub 12 4-7
power supply LED 4-10
power supply LEDs 3-3
RA4000 Controller LEDs 4-4
removing the Fan
Assembly 4-23
removing the power
supply 4-20
removing the power supply
blanking panel 5-2
removing the RA4000
Controller 4-12, 4-14
simple point-to point Fibre
Channel connection D-3
structure of data transmission
over Fibre Channel
cable D-9
firmware
drive failure F-1
updating D-4
frames See also data, transmitting
fields D-8
GBICs D-4
cables supported 1-1
FC-AL D-7
installing 2-3, 2-16, 2-17, 4-6,
4-7
kit contents 1-1
Longwave 1-1, 2-2, 2-18
removing 4-11, 4-13
replacing 4-13, 4-14
Shortwave 1-1, 2-2, 2-19
getting help xi
GigaBit Interface Converters See
GBICs
grounded outlets 2-4, 2-7, 2-22
grounding methods B-2
grouping physical drives 6-8
handles
power supply 5-2, 5-3
hard drives
adding 1-11
choosing bays 2-14
configuring 3-1
defining arrays 1-10
detecting F-4
ejector levers 2-15, 4-26, 4-27
failure 1-9, E-9, F-1
effect on performance E-7, E-8
multiple E-9, F-1
replacing F-4
heights supported 1-7
hot-pluggable 1-6, 2-1, E-16
ID markings 2-14
identifying 3-1
inserting 2-14, 4-26
installing 2-3, 2-14
intermixing 2-14
latches 2-15, 4-26, 4-27
LEDs 4-2
amber 4-2
location 1-7
online spare 1-10
performance 1-13
rebuilding E-16
recognizing 4-27
reconstructing 4-27
removing 4-26
removing in fault-tolerant
systems 4-24
replacement 1-6
replacing
automatically E-10
capacity E-16, F-4
clearance required 2-4
conditions 1-6