Installation Guide

Advance Preparation
Tools and Parts
Gather the required tools and parts before starting installation.
Read and follow the instructions provided with any tools listed here.
■ Tape measure
■ Phillips
screwdriver
■ Flat blade screwdriver
1/8” flat blade screwdriver
■ Level
■ Hand or electric drill
■ Wrench or pliers
■ Pipe wrench
1 5/16" combination wrench
■ Marker or pencil
■ Pipe-joint compound resistant to LP gas
3/16” (4.8 mm) carbide-tipped masonry drill
bit (for concrete/ceramic floors)
■ Noncorrosive leak-detection solution
FOR LP/NATURAL GAS CONVERSIONS:
1/2" Combination wrench
1/4" (6 mm) nut driver
9/32" (7 mm) nut driver
■ Masking tape
PARTS SUPPLIED:
Check that
all parts are included.
■ 5 - Burner caps
3 - Burner grates
2 - Oven racks
Anti-tip Device (explained on page 21)
2 plastic anchors
2 screws
The anti-tip device must be securely
mounted to the wall.
PARTS NEEDED
Check local codes and consult gas supplier.
Check existing gas supply and electrical
supply. See “Electrical Requirements” and
“Gas Supply Requirements” sections.
18
1 - Baking Tray
4 adjustable legs / rubber pegs
Gas Pressure Regulator