Installation Manual

6
Backsplash with screws Anti-tip bracket with screws
(COS-965AGC only)
Anti-tip wall anchor hooks with
screws (COS-965AGFC only)
Gas pressure regulator Gas pipe adapter with washers
Power cord with strain relief
(Pre-installed for COS-965AGC)
INSTALLATION REQUIREMENTS
TOOLS AND PARTS
Gather the required tools and parts before starting installation. Read and
follow the instructions provided with any tools listed here.
Tools Needed
Tape measure
Flat-blade screwdriver
Phillips screwdriver
Level
Drill
Wrench or pliers
Pipe wrench
15/16" (2.4 cm) combination
wrench
1/8" (3.2 mm) drill bit (for wood
floors)
Marker or pencil
Pipe-joint compound resistant
to Propane gas
3/16" (4.8 mm) carbide-tipped
masonry drill bit (for
concrete/ceramic floors)
Noncorrosive leak-detection
solution
For Propane/Natural Gas
Conversions
1/2" (1.3 cm) combination
wrench
1/4" (6 mm) nut drive
9/32" (7 mm) nut drive
Masking tape
Parts Supplied