INSTALLLATION, OPERATION, AND MAINTENANCE MANUAL INGLENOOK FIREPLACE INGLS 24-N, INGLS 24-P

Version 1.0b
15
STEP 4:
In STEP 4 the log grate assembly is installed in the Inglenook. This assembly is to be set into the alignment
slots provided. FIGURE 12 can be viewed for a look at the proper installation.
FIGURE 12: LOG RETAINER, STEP 4 COMPLETE
STEP 5:
The control panel is installed in STEP 5. The control panel face plate covers the ash pan housing opening.
FIGURE 13 shows the control panel faceplate installed. The control panel overlay, control knobs and
switches have not been shown for clarity purposes.
FIGURE 13: CONTROL PANEL, STEP 5 COMPLETE