Operating instructions

DISTRIBUTED BY: TRACTOR SUPPLY COMPANY
200 POWELL PLACE
BRENTWOOD, TN 37027
WWW.TRACTORSUPPLY.COM
MADE IN U.S.A.
6
ASSEMBLY & OPERATION INSTRUCTIONS MANUAL - 30 GALLON TRAILER SPRAYER #1046832
ASSEMBLING YOUR SPRAYER
Your sprayer has been partially assembled at the factory. Follow the instructions below to
complete the assembly of this unit.
STEP 1
Starttheangescrewsbyhand
to attach the hitch tube frame,
axle supports and trailer frame
strap to the tank. Insert the axle
through the axle supports and
hitch tube, then tighten down all
7angescrews.Thiswillallow
alignment within each assembly
for proper axle installation.
Please note the directional
stickers on the axle supports
and hitch tube for proper
orientation. All three arrows will
be facing the back of the tank,
towards the tank drain.
STEP 2
Slide axle spacers on to
axle (Qty. 2).
STEP 3
Put tires on axle
(Qty. 2).
**1/2”Wrench
Required **