(2) Requirements of inverter installation
According to the installation dimensions shown in Figure
3-2, secure the inverter on the hard ground or channel steel
chassis with M12 foundation bolts through the 8 16 holes
at the bottom of the equipment.
Front door: A 650mm space should be reserved to
ensure that the front door can be opened and closed freely.
Back: A 800mm space should be reserved for
maintenance.
The weight of the inverter is approximately 900kg. Make
sure that the mounting place can bear the weight. Two
approaches are recommended to lift the machine, i.e. lifting
with a crane or a forklift:
Lifting with a crane
Before lifting the machine, place the enclosed EPE
buffer material at the position as shown in Figure 3-3. Put 2
strings of sling rope each no shorter than 7 metersthrough