Technical data

44
Chapter 5 Operation
Figure 5-10 Diagram of filter net disassembly (top)
5.4.2 Replacement of internal filter net
The instructions of “5.1.2 Shutdown” should be
followed before opening the inverter for maintenance.
Electric shock hazard:
All operations and wiring should be performed by
qualified technical personnel.
Disconnect the inverter from PV assemblies and the
power Grid before the maintenance and operation of the
equipment.
Steps of replacement (Figure 5-10):
(1) Screw off 7 M4 bolts on the backboard of the inverter with
a T25 wabbler screwdriver.
(2) Rotate the backboard downward and pull it out when it
turns to about 45°. Screw off the grounding cable from
the backboard and take away the backboard, as shown
in Figure 5-11.
Filter net