Technical data

Chapter 4 Operation
29
Chapter 4 Operation
4.1 Start-up and shut-down
4.1.1 Start-up
Manual start-up: Manual start-up is required after initial
installation or manual (fault) shut-down. Move the cursor
from the main operation interface to “4 Setting”. Press
ENTER
and go to submenu “1 ON/OFF”. Then move
the cursor to “ON” and press ENTER
to start the
inverter. Then the inverter will start up and operate normally
if the start-up condition is met. Otherwise, the inverter stands
by.
Automatic start-up: The inverter will start up
automatically when the output voltage and power of PV
modules meet the set point, AC power grid is normal, and
the ambient temperature is within allowable operating range.
4.1.2 Shut-down
Manual shutdown : Normally, manual shutdown is not
required. It can be shut down manually if repair or
maintenance is required. Move the cursor from the main
operation interface to “4 Setting”. Press ENTER
and go
to submenu “1 ON/OFF”. Move the cursor to “OFF” and
press ENTER
, and then the inverter will be shut down.
Automatic shutdown: The inverter will shut down
automatically when the output voltage and power of PV
modules are lower than the set point, or AC power grid fails;