Technical data

Chapter 4 Operation
36
A
larm/
Protection/
Fault
Definition Possible causes
Recommended
solutions
switch, wait for 5
minutes, and then turn
on the switch again;
4Contact after-sales
service personnel
5PV1 (2)
Reverse*
PV module is
connected inversely
PV positive pole
and negative pole
are connected
inversely;
1Check whether
positive pole and
negative pole are
connected inversely;
2Contact after-sales
service personnel
6GFCI.Err
System leakage
current is too high
1Excessive
parasitic
capacitance on PV
module due to
environmental
factor;
2Grounding is
abnormal;
3Fault inside the
inverter
1Observe for 10
minutes and see
whether the alarm will
be eliminated
automatically;
2.Detect whether the
electrical connection is
abnormal
3Contact after-sales
service personnel
7IsolationErr
Insulation impedance
of PV positive to
ground or PV
negative to ground
exceeds the specified
range
Air humidity is high
1 Observe for 10
minutes and see
whether the alarm will
be eliminated
automatically;
2Check insulation of
PV system;
3Contact after-sales
service personnel
8
IntProtectA~Z
Internal protection of
the inverter
Protection
procedure occurs
inside the inverter
1Observe for 10
minutes and see
whether the alarm will
be eliminated
automatically;
2Contact after-sales
service personnel