PART LIST Marble Top Top Frame Side Panel Shelf Panel Hand Rail 1PC 1PC PCS PCS PCS HARDWARE LIST 1/2'L 1/4' x 5/8"L 114 x1"L 114 Short Bolt Bolt Medium Bolt Long Bolt Allen Wrench 8 PCS (Extra) 8 PCS (Extra 1) 4 PCS (Extra 1) 8 PCS (Extra 1) 1PC
Step 1. Attach top frame (part B) to side panels (part C) using medium bolts (part #3) and Allen wrench (part #5). Note: Pleads do not fully tighten bolts at this time. Step 2. Attach shelf panels (part D) to side panels {part C) using long bolts (part #4) and Allen wrench (part #5). Note: Please fully tighten all bolts at this time.
Step 3. Carefully lay marble top {part A) upside down on a flat, soft surface, such as carpet. Attach assembled unit (parts marble top {part A) using bolts (part #2) and Allen wrench {part #5). Note: Please fully tighten all bolts at this time. 2 o x86 # 7 x1 Step 4. Carefully tum unit upright. Attach hand rails {(part E) to side panels {part C} using short bolts {part #1) and Allen wrench (part #5). Note: Please fully tighten all bolts at this time.