PART LIST Top Panel Left Panel Right Panel Bottom Panel Left Door 1PC 1PC 1PC 1PC 1PC Right Door Adjustable Shelf Upper Rail Lower Rail Back Panel 1PC PCS 1PC 1PC 1PC IK] Support Plate 1PC
HARDWARE LIST [#1] [#2] [#3] [#4] [#5] 30mm 24 x 22mm Long Bolt Wood Dowel Handle Short Bolt Shelf Holder 8 PCS 16 PCS (Extra 1) PCS 4 PCS (Extra 1) 8 PCS (Extra 1) [#7] x15mm 24 %38mm 28 x38mm Double Magnet Screw Allen Wrench Long Screw Wall Anchor 1PC PCS 1PC PCS 4 PCS ADDITIONAL TOOLS (Not Provided) Note: It is not recommended to use power tools during assembly. = Phillips Head Screwdriver Note: Wood dowels are intended for alignment.
Step 1. Attach handles (part #3) to left door (part E) and right door (part F) using short bolts (part #4) and fillips head screwdriver. Step 2. Attach double magnet (part #6) to top panel (part A) using screws (part #7) and fillips head screwdriver.
Step 3. Attach top panel (part A) and bottom panel (part D) to left panel (part B) using wood dowels (part #2), long bolts (part #1) and Allen wrench (part #8). Step 4. Attach upper rail (part H) and lower rail (part |) to left panel (part B) using wood dowels (part #2).
Step 5. Slide back panel (part J) into the grooves of assembled unit (parts Step 6. Attach right panel (part C) to assembled unit (parts using wood dowels (part #2), long bolts (part #1) and Allen wrench (part #8).
Step 7. Carefully turn the unit upright. Attach doors (parts placing bottom pin hinge (per-installed in door) in the per-drilled hole of bottom panel (part D), then depress the top spring-loaded pin hinge so it can be placed in the per-dilled hole of top panel (part A). Note: Be sure top and bottom pin hinges are fully extended to secure doors in place.
Step 8. Hold support plate (part K) in desired location. Support plate (part K) will be about lower than the top of assembled unit. Make sure support plate (part K) is level, we recommend using a leveler to ensure it's oriented correctly. Use a pencil to mark the anchor locations using support plate (part K) screw holes as a guide. Drill two 11/32" holes in these marked spots and tap wall anchors (part #10) into the drilled holes.