Manual

5. To place the new belt begin by routing the belt around the
two outer spindle pulleys, then around the front spindle
pulley as shown in Fig. 7-8.
f
Outer Spindle
Pulleys
Figure 7-8
6. Route the belt around the two deck idler pulleys as shown
in Fig. 7-8.
7. Retighten the belt keeper rod loosened earlier.
8. Remount the belt guards removed earlier.
9. Re-install the deck making sure the belt remains routed
around the pulleys as instructed.
10. Pull the right side of the belt and place the narrowV side of
the belt into the PTO pulley. See Fig. 7-9.
PTO Belt
J
11.
Figure 7-g
While holding the belt and pulley together, rotate the
pulley to the left (See Fig. 7-9). Continue holding and
rotating the pulley and belt until the belt is fully rolled into
the PTO pulley.
SECTION7-- SERVICE