Warranty

12 Section 4 — ASSembly & inStAllAtion
Installing the Discharge Chute
When installing the discharge chute, two different installation
instructions exist. For the 54” Fabricated deck units, the
discharge chute elbow mounts directly onto the cutting deck.
For the 50” and 54” stamped decks, an adapter must first be
installed. Be sure to follow the instructions that pertain to the
unit you are installing this bagger on.
54” Fabricated Deck Units:
1. Raise the deck to its highest position.
2. Raise the chute deflector (1 in Figure 4-19) on the deck and
hold it while you position the discharge chute over the
chute opening.
1
2
3
Figure 4-19
3. Insert the end of the discharge chute elbow (2) into the
hole provided in the deck wheel mount as shown in the
inset of Figure 4-19.
4. Pivot the discharge chute rearward until the hole in the
discharge chute elbow aligns with the pin on the deck.
Move the discharge elbow down onto that pin as shown in
3 of Figure 4-19.
6. Secure the flexible hose extension to the upper chute
assembly using the (726-05019) hose clamp included in
hardware pack 689-00342.
Figure 4-17
Note: Orientate the hose clamp so that it aligns over the
wide adhesive rubber strip previously installed on the
chute extension tube, and the excess from the clamp
points inward and down with the tightening screw facing
outward. See the inset of Figure 4-17.
Note: It is best to only snug-fit this clamp in this phase as
you will be instructed to tighten it later once the discharge
chute is installed on the tractor and adjusted.
7. Apply the other wide adhesive rubber strip, included in
Hardware Pack 689-00342, onto the upper end of the
discharge chute elbow. Place the adhesive strip up against
the ridge in the upper portion of the discharge chute
elbow, as detailed in the inset of Figure 4-18.
Figure 4-18