Warranty

11Section 4 — ASSembly & inStAllAtion
19. Lower the bagger hanger assembly down onto the upright
support bracket, as shown in 3 of Figure 4-14. Secure the
hanger assembly to the upright mounting bracket using
the remaining 5/16” carriage bolt and flange lock nut
packed in with the upright bracket. See 4 in Figure 4-14.
3
4
4
Figure 4-14
20. Snap the plastic upper chute support in place by first
clipping the side portion onto the bagger support rail (1)
with the edge of the snap feature aligned with the red line,
as seen in the inset of Figure 4-15.
1
2
Figure 4-15
21. Snap the front side of the chute support to the rail (2), as
shown in Figure 4-15.
15. Install the bagger cross-support bracket with the flange facing
outward, as shown in Figure 4-12, by attaching it to the side
support brackets using four 710-04048 hex screws and 712-
3004A flange lock nuts from hardware pack 689-00338.
16. Further secure the bagger cross-support bracket to the
tractor by installing four 710-04043 hex screws through
the cross-support bracket and into the rear of the tractor
frame. Secure using four 712-3004A flange lock nuts from
hardware pack 689-00338. See Figure 4-12.
Figure 4-12
Note: If you decided to leave the hitch support only
finger tight during the assembly process, tighten all of the
hardware securely at this time.
17. Install the bagger upright mounting bracket onto the
mounting assembly (1 in Figure 4-13) of the tractor by
hooking it over the bagger cross-support bracket near the
center, lining up the corresponding mounting hole with
the deck size of the tractor this bagger is being installed on.
See the inset of Figure 4-13.
18. Secure the upright mounting bracket to the mounting
assembly using a 5/16” carriage bolt and flange lock nut
packed in with the upright bracket. See 2 in Figure 4-13.
48-inch 60-inch
54-inch
1
2
2
Figure 4-13