Specifications

14
Cybex Owner’s Manual
Install individual weight plates one at at time
1. Position each weight plate so wide edges of bushings face upward and narrow edges of
bushings face downward.
CORRECT
Wide bushing
edge faces upward
The narrow bushing edge
must face downward.
WRONG
2. Install lifting post.
3. Snap guide rods in to position.
Cable routing
1. Place a small amount of loctite® on BHSCS and inside threads of ball stop.
2. Secure cable to ball stop using a 1/8” Allen wrench.
3. Reconnect handle, pulley and cable to platform on both sides.
4. Position pulley mount parallel to the top weight.
5. Pull down on pulley mount until cable is tight.
6. Verify cable is still routed through all pulleys.
7. Attach pulley mount to lifting post with spiral pin using a hammer and 3/16” pin punch.
Spiral
pin
8. Lift top weight up and down simulating normal operation (without selecting any resistance).
9. Verify the cable is moving smoothly.
Install back panels
Verify proper operation