Installation manual

12
5. Lower the ISS base onto the
stack so that the screw goes
into the boss nearest the
solar panel.Turn the screw a
few times to engage the
threads.
6. Place a lock washer and
washer on the other two
3 1/4” screws then insert
them through the remaining
two screw holes.
7. Tighten all three screws to
securely fasten the radiation
shield and solar panel
bracket to the ISS base.
#8-32 x 3-1/4"
Screws (3)
#8 Lock Washers
#8 Flat Washers
Fan Plate
Open Cap Plate
(hole in center)
Closed Cap Plate
(no hole)
Solar
Power
Cable
Rain
Collector
Cable
Solar Panel
& Bracket
ISS Base
Insert this screw first
Power Cable
(Wireless ISS Only)
Figure 18. Upper Shield Assembly