Specifications
Site Location and Preparation | 17
3
Site Location and Preparation
The S4820T is suitable for installation as part of a Common Bond Network (CBN). It can be installed in:
• Network telecommunication facilities
• Data centers
• Other locations where the National Electric Code (NEC) applies
This chapter contains the following sections regarding where and how the S4820T should be installed:
• Site Selection
• Cabinet Placement
• Rack Mounting
• Grounding
• Fans and Airflow
• Power
• Storing Components
NOTE: Install the S4820T system into a rack or cabinet before installing any optional components.