Administrator Guide

3
Getting Started
This chapter describes how you start configuring your system.
When you power up the chassis, the system performs a power-on self test (POST) during which the line
card status light emitting diodes (LEDs) blink green. The system then loads the Dell Networking Operating
System (OS). Boot messages scroll up the terminal window during this process. No user interaction is
required if the boot process proceeds without interruption.
When the boot process completes, the RPM and line card status LEDs remain online (green) and the
console monitor displays the EXEC mode prompt.
For details about using the command line interface (CLI), refer to the Accessing the Command Line
section in the Configuration Fundamentals chapter.
Console Access
The has two management ports available for system access: a serial console port and an out-of-bounds
(OOB) port. The Z9000 has a primary management (Ethernet) port and an RJ-45/RS-232 console port.
Serial Console
The RJ-45/RS-232 console port is labeled on the Z9000 chassis. It is in the upper right-hand side, as you
face the I/O side of the chassis.
Figure 1. RJ-45 Console Port
1. RJ-45 Console Port
Getting Started
43