Installation manual

Mounting the Chassis in a Four-Post Rack
Safety Considerations for Rack Mounting
WARNING: You must use a lifting device, such as a fork-lift trolley, to lift the chassis.
The following guidelines are general safety considerations. For detailed information, read the safety
instructions in your Safety, Environmental, and Regulatory information booklet before you begin.
Rack loading — Overloading or uneven loading of racks may result in shelf or rack failure, which may
damage equipment and cause possible personal injury. Stabilize racks in a permanent location before
loading begins. Mount the components beginning at the bottom of the rack, then work to the top. Do
not exceed your rack load rating.
Power considerations — Connect only to the power source specified on the unit. When multiple
electrical components are installed in a rack, ensure that the total component power ratings do not
exceed the circuit capabilities. Overloaded power sources and extension cords present fire and shock
hazards.
20
Z9500 Installation