Installation manual

Figure 12. Routing DAC cables using the Cable Management System
1. Pin rack unit for DAC cable routing 2. Rack unit for DAC cable routing
NOTE: To fully populate the cable management system in a 1070 mm cabinet, the maximum
supported length of the DAC cable is 5 m.
Installing the Cable Management System for Optical Fibres
Insert an optical cable in a Z9500 port. then route the optical cable up and along the line-card face
above the switch. Position the cables so they follow the channel marked in the figure below and exit
to the right or left, depending on the chassis slot location. The cables should emerge from right and
left side of the panel.
Z9500 Installation
31