User guide

Rack Installation Guide 1-9
Figure 1-2. VersaRails Rack Kit Contents
Installation Tasks
Installing a rack kit involves performing the following tasks in their numbered order:
1
Removing the rack doors
2
Marking the rack (if necessary)
3
Installing the slide assemblies in the rack:
RapidRails installation
VersaRails installation
4
Installing the system in the rack
5
Installing the cable-management arm
6
Routing cables
7
Replacing the rack doors
Removing the Rack Doors
See the procedures for removing doors in the documentation provided with your rack cabinet.
CAUTION: Because of the size and weight of the rack cabinet doors, never attempt to remove or install
them by yourself.
CAUTION: Store the two doors where they will not injure someone if the doors accidently fall over.
slide assemblies (2)
10-32 x 0.5-inch
flange-head
Phillips screw (8)
cable-management arm
status indicator cable (if applicable)