Configuring power cap policy using RACADM
To view and configure the current power cap values, use the following objects with the set command:
System.Power.Cap.Enable
System.Power.Cap.Watts
System.Power.Cap.Btuhr
System.Power.Cap.Percent
For more information, see the iDRAC RACADM Command Line Interface Reference Guide available at dell.com/idracmanuals.
Configuring power cap policy using iDRAC settings utility
To view and configure power policies:
1. In iDRAC Settings utility, go to Power Configuration.
NOTE: The Power Configuration link is available only if the server power supply unit supports power monitoring.
The iDRAC Settings Power Configuration page is displayed.
2. Select Enabled to enable the Power Cap Policy Else, select Disabled.
3. Use the recommended settings, or under User Defined Power Cap Policy, enter the required limits.
For more information about the options, see the iDRAC Settings Utility Online Help.
4. Click Back, click Finish, and then click Yes.
The power cap values are configured.
Configuring power supply options
You can configure the power supply options such as redundancy policy, hot spare, and power factor correction.
Hot spare is a power supply feature that configures redundant Power Supply Units (PSUs) to turn off depending on the server load.
This allows the remaining PSUs to operate at a higher load and efficiency. This requires PSUs that support this feature, so that it
quickly powers ON when needed.
In a two PSU system, either PSU1 or PSU2 can be configured as the primary PSU. In a four PSU system, you must set the pair of
PSUs (1+1 or 2+2) as the primary PSU.
After Hot Spare is enabled, PSUs can become active or go to sleep based on load. If Hot Spare is enabled, asymmetric electrical
current sharing between the two PSUs is enabled. One PSU is awake and provides the majority of the current; the other PSU is in
sleep mode and provides a small amount of the current. This is often called 1 + 0 with two PSUs and hot spare enabled. If all PSU-1s
are on Circuit-A and all PSU-2s are on Circuit-B, then with hot spare enabled (default hot spare factory configuration), Circuit-B has
much less load and triggers the warnings. If hot spare is disabled, the electrical current sharing is 50-50 between the two PSUs, the
Circuit-A and Circuit-B normally has the same load.
Power factor is the ratio of real power consumed to the apparent power. When power factor correction is enabled, the server
consumes a small amount of power when the host is OFF. By default, power factor correction is enabled when the server is shipped
from the factory.
Configuring power supply options using web interface
To configure the power supply options:
1. In iDRAC Web interface, go to OverviewServerPower/ThermalPower ConfigurationPower Configuration. The
Power Configuration page is displayed.
2. Under Power Supply Options, select the required options. For more information, see iDRAC Online Help.
3. Click Apply. The power supply options are configured.
Configuring power supply options using RACADM
To configure the power supply options, use the following objects with the set command:
161