Owners Manual

Figure 58. Removing the NVRAM backup battery
a. positive side of battery
b. negative side of battery connector
Figure 59. Installing the NVRAM backup battery
a. positive side of battery
b. negative side of battery connector
1. Install the following:
a. System board
b. IDSDM or rSPI card
c. NDC
d. PCIe mezzanine cards
e. Hard drive or SSD cage
f. Hard drive or SSD backplane
g. Cooling shroud
h. Hard drives or SSDs
2. Follow the procedure listed in the After working inside your system section.
3. Enter the System Setup to confirm that the battery is operating properly.
4. Enter the correct time and date in the System Setup's Time and Date fields.
5. Exit the System Setup.
6. To test the newly installed battery, remove the sled for at least an hour.
7. Reinstall the sled after an hour.
8. Enter the System Setup and if the time and date are still incorrect, see the Getting help section.
Related references
Getting help on page 128
108
Installing and removing sled components