Hardware Owner's Manual

Installing Blade Components 215
4
PowerEdge M910 and M905 systems only
- You must slide the system board
back in the blade chassis to access memory sockets (B1-B8) and (D1-D8)
for M910 and (C1-C4) and (D1-D4) for M905. See step 1 through step 9
in "Removing the System Board" on page 276.
5
Press down and out on the ejectors on each end of the socket until the
memory module pops out of the socket. See Figure 3-22.
6
PowerEdge M910 and M905 systems only
- If you removed the system board
to access the memory modules, reinstall the system board.
7
Close the blade. See "Closing the Blade" on page 161.
8
Install the blade. See "Installing a Blade" on page 158.
Mezzanine Interface Card (PowerEdge M610x
Only)
The mezzanine interface card is installed on the MEZZ1_FAB_C and
MEZZ2_FAB_B connectors on the system board and provides connectivity
between the PCIe expansion-card riser and the system board.
Removing the Mezzanine Interface Card
1
Remove the blade. See "Removing a Blade" on page 155.
2
Open the blade. See "Opening the Blade" on page 159.
3
Disconnect the data cables from the interface-card connectors.
To disconnect a data cable, press the release latch on the connector, push
inward slightly, then outward to release the cable connector from the
interface-card connector.
4
Remove the cable management clip from the chassis inner wall. See
Figure 3-12.
5
Open the card retention latch by pressing the ridged area on the latch with
your thumb, and lifting the end of the latch. See Figure 3-23.
NOTE: Hold the mezzanine interface card by its edges only.
6
Lift the interface card straight up from the system board.
7
Close the card retention latch.
8
Close the blade. See "Closing the Blade" on page 161.