Setup Guide

34 Two-Post Rack Installation
3
Remove the bracket and then place the bracket on either the 7.62-cm or 15.24-cm (3-inch or 6-inch)
wide flush-mount threaded studs (see Figure 2-5).
4
Using the two nuts that you removed in step 2, tighten the nuts finger tight to secure the adjustable
mounting bracket (see Figure 2-5).
5
Repeat step 2 through step 4 to configure the other mounting rail.
Figure 2-5. Configuring the Adjustable Mounting Bracket for Flush-Mount Installation
6
Holding the left mounting rail at the location you marked, position the flush-mount mounting flange
against the front of the vertical two-post rack and secure it to the two-post rail with two 12-24 x
0.5-inch pan-head Phillips screws (see Figure 2-6).
1 nuts (2 per bracket) 2 adjustable mounting bracket 3 7.62-cm (3-inch) wide, flush-
mount, threaded studs
4 flush-mount mounting flange