PowerEdge R820 results
AQRT of R820 test environment Figure 6.
CPU Utilization of R820 test environment Figure 7.
Figure 6demonstrates that all VM are scaling up to 5200 userload simultaneously with SLA below 2 sec.
Figure 7 shows that average CPU utilization across all VMs is ~70% while they are supporting 5200 users.
Also it can be noted that there is roughly ~24% IO wait time, means that VM CPU resources are waiting
for the storage system to provide the data and there is storage bottleneck.
We may conclude from Figures 6 and 7 that all four VMs support 5200 userload with 70% CPU
utilization.
0
0.5
1
1.5
2
2.5
3
3.5
4
4.5
5
400 800 1200 1600 2000 2400 2800 3200 3600 4000 4400 4800 5200 5600
AQRT vs Userload of all VMs
VM1
VM2
VM3
VM4
0
20
40
60
80
average user
time
average system
time
average idle
time
average iowait
time
Avg. CPU Utilization at 5200 load on all
VMs