Users Guide
LED blinking behavior
If the USB LED is present, it indicates the following:
• Solid green – When the server configuration profile is being copied from the USB device.
• Blinking green – When the job is in-progress.
• Solid green – When the job has completed successfully.
Logs and results file
The following information is logged for the import operation:
• Automatic import from USB is logged in the Lifecycle Controller log file.
• If the USB device is left inserted, the job results are recorded in the Results file located in the USB key.
A Result file named Results.xml is updated or created in the subdirectory with the following information:
• Service tag – Data is recorded after the import operation has either returned a job ID or returned an
error.
• Job ID – Data is recorded after the import operation has returned a job ID.
• Start Date and Time of Job - Data is recorded after the import operation has returned a job ID.
• Status – Data is recorded when the import operation returns an error or when the job results are
available.
323