Owners Manual

7 Prepare the cable chains and route the cables through the cable chains.
NOTE: Label the cables before routing them through the cable chains.
a Align the cable chains so the latches are facing up and the hinges are all facing each other.
b Unclip and open the all of the latches on the cable chains.
Figure 9. Open the Cable Chain Latches
c Route two power cables and two Mini-SAS HD cables through each cable chain.
d Close the latches and make sure that they are snapped shut.
e Arrange the cable chains to form a "U" shape with the latches facing up.
f Insert the cable chains through the back side of the tray.
Figure 10. Position the Cable Chains
8 Attach the clips on the cable chains to the tabs on the back of the 1U cable management rails.
16
SC460 Expansion Enclosure Installation