User Manual

Table Of Contents
32
|
Installation
Table 2. UPS Wiring Specifications
Wire Function
Terminal
Position
UPS Wire Function
Terminal Wire
Size Rating*
Tightening Torque
Input
1
Input Ground
16–35 mm
2
(8–2 AWG)
1.7 Nm (15 lb-in)
2
L2/Neutral In
3
L1 In
* Use a minimum:
S 10 mm
2
(
8 AWG) for equipment grounding wire, 75_C copper wire minimum
S 25 mm
2
(
4 AWG) for input line and neutral wires, 75_C copper wire minimum
7 Replace the terminal block cover.
8 Continue to the following section, “UPS Initial Startup.”
UPS Initial Startup
On/Off Button
LCD Panel
Scroll Button (Down or Forward)
Select Button
Scroll Button (Up or Back)
Figure 23. Starting the UPS