Manual

39
Configuring the Card
|
UPS Weekly Schedule Programming
Click Weekly Schedule from the menu bar to set up the timing of specific weekly actions (see
Figure 23).
Figure 23. Weekly Schedule Page
NOTE: UPS configuration can prevent the shutdown and restart commands from being run properly. Refer to
the UPS user's manual for more information.
The weekly schedule enables the administrator to optimize power consumption or program a reboot of
the protected equipment at a set time.
In a shutdown sequence, the Dell UPS Management Software connected to the card is informed,
ensuring that each machine is shut down correctly before the UPS output is switched off. You can
program up to seven UPS shutdown sequences in one week, with a minimum shutdown delay of
30 minutes.
The On/Off sequences are valid only if the card's time has been set properly.
NOTE:
For security purposes, the administrator must click Save and enter the admin user name and password
to save modifications or run commands. The default user name and password are both admin.