Specifications

66
Reactor/Choke
Disconnect all leads to the reactor.
Remove the two mounting bolts and lift out.
Set new reactor on SCR base and start screws back into base. Be sure to use the original
screws and washers. run screws in to base finger tight.
Check that the bottom of the reactor is flat against the base.
Alternately tighten the two screws by 1/4 turn until firm.
Replace all connections removed in step 1.