Installation Guide

14 T20 Series Installation
2
Cartridge Installation
C.
Turn off water supplies. Remove
cover (1) and bonnet nut (2) from the
body, if necessary. If this is not a thin
wall mounting, the entire plasterguard (3)
may be removed.
For back to back or reverse installations
(hot on right and cold on left) insert the
cartridge with the ā€˜Cā€™ on the left. If you
are not making a reverse or back to back
installation skip this step and continue
with step 2C.
Slide bonnet nut (1) over the wire and car-
tridge (2) and thread onto the body. Hand
tighten securely. Note: After bonnet nut
is installed, verify the valve is in the off
position. Rotate stem clockwise.
B.
Back to back Installation
Normal Installation (changes not required)
Reverse
Installation
Cold
Hot
1
4
4
3
1
6
A.
1
2
3
Rotate the cartridge (1) so the letter ā€˜Cā€™
(2) appears on the right. Insert cartridge
into valve body as shown. Make sure
the cartridge tubes and O-rings (3) are
properly seated in holes at the base of the
body. Ensure the keys on the body are fully
engaged with the slots in the body (4).
2
2