Specifications

Page 9
ENGINE DRIVEN ROLLER PUMP PLUMBING PARTS BREAKDOWN
9
8
6
4
3
2
7
5
1
9
10
9
11
10
16
18
17
13
14
15
12
18
18
18
18
19
18
18
23
22
20
21
24
25
19
26
26
26
26
26
26
26
26
26
26
26
29
28
27
27
28
27
27
31
30
30
30
30
30
30
32
32
32
32
32
33
33
33
33
34
37
36
38
35
34
34
43
40
45
39
44
41
39
39
28
d
c
a
b
A
B
C
D
NOTE: Use thread sealant
on all threaded fittings.
OPERATING INSTRUCTIONS
1. Fill the tank with water.
2. Open the Ball valve (A) in the pump intake line.
3. Open (counter clockwise) the pressure relief valve (B).
4. Open the Tee valve (C) so that all the boom sections are
spraying.
5. Open the agitation valve (D).
6. Start and run pump.
7. Slowly close the pressure relief valve (B) until the desired
spraying pressure is reached with the boom spraying.
8. If adequate spraying pressure cannot be reached, slowly
close the agitation valve (D) until the desired spraying
pressure is reached.
9. Check for leaks.