Installation Guide

13
power wall switch.
11. Locate and separate by wire nut the 1 (red) and 2 (red).
12. Secure the 2 remaining Ground wires (green) with a ground screw in the
main switch wall box.
13. Ensure that all connections are tight.
14. Insert all the wiring of the main power wall switch into the main switch wall
box.
15. Insert all the wiring back into the unit and secure with a cable clamp.
FROM MAIN SWITCH
2 CONDUCTOR WIRE
FROM POWER SUPPLY
2 CONDUCTOR WIRE
L2
N
L1
G
L1 FROM UNIT
G FROM
POWER SUPPLY
G FROM UNIT
L1 FROM
POWER SUPPLY
NEUTRAL FROM
UNIT AND SUPPLY
UNIT AND SUPPLY
NEUTRAL FROM
POWER SUPPLY
L1 FROM
G FROM UNIT
POWER SUPPLY
G FROM
L1 FROM UNIT
G
L1
N
L2
1
2