User manual

Bio-inert Quaternary Pump User Manual 35
Installing the Pump
3
Installing the Pump
4 Connect the required interface cables to the quaternary pump, see
“Connecting Modules and Control Software” on page 36.
5 Connect all capillaries, solvent tubes and waste tubing (see “Flow
Connections of the Pump” on page 38).
6 Press the power switch to turn on the module.
7 Purge the quaternary pump (see “Initial Priming” on page 41).
8dc[^\jgVi^dchl^iX]
Hadi[dg^ciZg[VXZWdVgY
6cVad\egZhhjgZ
6E<gZbdiZ
GH"'('8
86C
EdlZg
The power switch stays pressed in and a green indicator lamp in the power switch is on
when the module is turned on. When the line power switch stands out and the green light
is off, the module is turned off.
The pump was shipped with default configuration settings. To change these settings, see
“Setting the 8-bit Configuration Switch (without On-board) LAN” on page 176.