User manual

58 1260 Nanoflow Pump User Manual
3 Installing the Module
Get the System Ready for the First Injection
Get the System Ready for the First Injection
When you are using the system for the first time it is recommended to prime it
to remove all the air and the possible contamination introduced in the flow
path during the installation.
Manually Priming the Solvent Channels
1 The degasser accessory kit contains a 20 mL plastic syringe and a solvent
tube adapter for the syringe. Push the adapter onto the syringe.
2 Fill required analytical solvents into the solvent bottles, and install the
bottles on the described solvent channels. Use isopropanol for channels
which will not be used right away.
3 Put a paper towel over the leak sensor in the pump leak tray.
4 Disconnect the channel A solvent tube from the A1 port of the pump solvent
selection valve.
5 Connect the end of the solvent tube to the syringe adapter. Slowly draw one
syringe volume (20 mL) from the solvent tube.
6 Disconnect the solvent tube from the syringe adapter, and reconnect the
tube to the A1 port of the solvent selection valve. Eject the syringe contents
into an appropriate waste container.
NOTE
The pump should never be used for priming empty tubings (never let the pump run dry). Use
the syringe to draw enough solvent for completely filling the tubings to the pump inlet
before continuing to prime with the pump.
WARNING
Liquid may drip from the disconnected solvent tube.
Make sure to follow appropriate safety precautions.
NOTE
This procedure should be carried out before the modules are turned on.