User manual

1260 Nanoflow Pump User Manual 67
Using the Pump
4
Checkout procedure for a G2229A Nano LC System
Checkout procedure for a G2229A Nano LC System
Use this procedure to confirm that
the system has been installed correctly
the Nanoflow LC System performs within specification
a technical problem is caused by the Nanoflow LC System
1 Purge channel A1 with 100 % water at 2.5 mL/min for 2 min
2 Purge channel B1 with 100 % aetonitrile at 2.5 mL/min for 2 min.
3 Pump 10 µL/min, normal mode, 100 % (water) for at least 5 min.
4 Pump 10 µL/min, normal mode, 100 % B (acetonitrile) for at least 5 min.
5 Check the pressure tightness of the system by executing a micro pressure
test with port 6 of the autosampler valve blanked off.
6 Install the restriction capillary to port 6 of the autosampler injection valve.
7 Pump 1.5 µL/min, micro mode, 70 % A (water) / 30 % B (acetonitrile). Pump
as long as it takes for the pressure to get stable. Continue pumping for at
least 5 min more before continuing.
Parts required # Description
G1379B 1260 Micro Degasser
G2226A 1260 Nanoflow Pump
G1377A 1260 Micro High Performance Autosampler
G2226-67300 Nanoflow restriction capillary
Preparations Channel A1: Water
Channel B1: Acetonitrile
Channel A2: Isopropanol
NOTE
You can speed up the preparation by skipping steps 3 and 4 and running step 7 in pressure
control mode at 140 bar (pressure control mode can be enabled in the module service
center of Lab Advisor software).