Installation Guide

DOLLE USA
1200 Mendelssohn Ave. No., Suite 140
Minneapolis, MN 55427
763-746-7830 763-746-7835 fax
1
PROVA Systems
Installation Guidelines
Thank you for choosing PROVA for your new railing system. The following guidelines
will help you to ensure that your railing is installed as designed. Failure to follow these
guidelines could result in failure of building official inspections, voiding of warranty, or
loss of structural integrity. As local building codes can vary, always consult your local
officials for specific requirements. All components are packaged separately, and have
instructions on the back.
1. Fasteners
Use only PROVA fasteners for installing posts, fittings, or hand rails.
PROVA Heavy Duty Post Anchor For Concrete (PA23)
These anchors are 2 ¾” compression anchors for a 3/8” diameter pilot hole. Do not install
within 1” of the edge of the concrete. Use only in solid concrete, not veneers. Always
insure adequate backing is in place.
PROVA Hex Screws For Posts- Wood (PA22)
These 2 5/8” screws are for a 5/16” pilot hole. All screws are required to be anchored in
solid wood backing. (ie: lateral bracing, blocking, or framing.) Do not install within 3/4
of the edge of backing lumber. Always insure adequate backing is in place.

Summary of content (7 pages)