Manual

14
CoolFreeze
Operation
5.2 Accessories
If you want to operate the coolers CF-18 and CF-25 from the
240 V AC mains, be sure to use the rectifier WAECO CoolPower EPS-816
(CF-18 only) or EPS-817 (CF-18 and CF-25).
6 Operation
6.1 Before initial use
Note
Before starting your new cooler for the first time, you should clean it
inside and outside with a damp cloth for hygienic reasons (please also
refer to the chapter “Cleaning and maintenance” on page 22).
Mounting the handles
CF-35, CF-40, CF-50, CF-60
The handles are enclosed unassembled. If you wish to attach the
handles, proceed as follows:
Make a handle by putting two holders (Fig. 7 1, page 5) and a
handle (Fig. 7 2, page 5) together.
Fasten the grip with the enclosed screws in the holes provided.
Turning the lid around
CF-50, CF-60
You can turn the lid around if you want to open the lid from the other
side.
To do this, proceed as follows:
Open the lid and pull it out (Fig. 8 A, page 6).
Turn the lid.
Insert the lid in the lid holders on the opposite side of the cooler
(Fig. 8 B, page 6).
CF18-60_M_81003:PowerVac_PV-100 3/9/08 3:53 PM Page 14