Operation Manual

B. The machine is equipped with the Efka DA321G drive
Pull the network plug out of the socket.
Screw out 4 screws on the front panel of the control box.
Dismantle the front panel.
Pull the transformer cable through the channel (1) in the control
box.
Remove the black rubber bushing (2).
Pierce the bushing with a screwdriver.
Pull the sewing lamp transformer cable through the arisen hole.
Insert the rubber bushing back again.
Press the clip openers (3) and (4) with a small screwdriver slightly
until the clips (5) and (6) open.
Connect the blue conductor to the terminal (6) and the brown
conductor to the terminal (5).
Screw the front panel back again.
17
EN
26 5 1
65 4 3