User Manual

INSTALLATION
The PLS2 should be mounted on the side or top of the tank or bin. The
conduit opening should be placed in a downward position, to protect from
moisture entering the unit through the conduit. When selecting a mounting
location, be sure the material can freely flow to and away from the shaft and
paddle. The shaft and paddle should also be out of the direct flow of material
as it fills the bin or tank. If it is necessary to mount in the flow stream, a
protective baffle should be installed on the inner wall of the bin.
Wiring
Make electrical connections per the wiring diagram for output switch options
selected. Wire in accordance with local codes. For hazardous locations, a
sealing fitting must be located within 18˝ of the control.
ASSEMBLY
MOUNTING PROCEDURE
ADJUSTMENT OF THE SPRING FORCE
MAINTENANCE/REPAIR
Upon final installation of the Series PLS2, no routine maintenance is
required. The Series PLS2 is not field serviceable and should be returned
if repair is needed. Field repair should not be attempted and may void
warranty.
WARRANTY/RETURN
Refer to “Terms and Conditions of Sales” in our catalog and on our website.
Contact customer service to receive a Return Goods Authorization number
before shipping the product back for repair. Be sure to include a brief
description of the problem plus any additional application notes.
DWYER INSTRUMENTS, INC.
Phone: 219/879-8000 www.dwyer-inst.com
P.O. BOX 373 MICHIGAN CITY, INDIANA 46361, U.S.A. Fax: 219/872-9057 e-mail: info@dwyer-inst.com
©Copyright 2011 Dwyer Instruments, Inc. Printed in U.S.A. 11/11 FR# R4-443903-00 Rev. 1