Operating Guide

NEVER LEAVE THE HEATER
UNATTENDED WHILE BURNING!
2. ASSEMBLY
For KFA80C Model only
(Assembly time for this product is 3 minutes)
For KFA135C/220C Models only (Assembly time for this product is 10 minutes)
Tools Required
Medium Phillips Screwdriver.
1) Lift front guard for arrow direction and
make sure that guard’s wedged portion
fits into the slit hole on the upper housing.
Tools Required
• Medium Phillips Screwdriver.
• 3/4 inch socket or adjustable wrench
Assembling Handle & Wheel and Cord Wrap
1) Slide threaded axle through the rear section of the wheel support frane.
2) Slide one axle bushing on to each side of the axle. Slide one wheel on to each side of the axle.
Attach one cap nut on to each side of the threaded axle and tighten well.
3) Place heater on wheel support frame. Align the holes on fuel tank flange with holes on wheel support frame.
4) Position the Handles on top of fuel tank flange.
Insert screws through handles, fuel tank flange and wheel support frames as shown in Figure 8 and
attach nut finger tight after each screw is inserted.
5) Align the hole on the handles with the mounting hole on the Cord Wrap.
Insert Screws through Cord Wrap, handles and attach nut finger tight after each screw is inserted.
6) After all screws are inserted, tighten nuts firmly.
2) Remove the pre-assembled screws on the
shell upper and side cover.
3) Align the holes in the upper housing with
two mounting holes on the handle as
shown in Figure 6.
4) Secure handle with the screws removed.
5) Insert card wrap into the rectangle holes on the
supportor and align the hole on the cord wrap with
the mounting hole on the side cover as shown in
Figure 6.
6) Secure cord wrap with the screws removed.
Figure 6. Assembling Handle & Cord Wrap
Handle
Screw
Front Guard
Wedged Portion
Slit Hole
Side Cover
Cord Wrap
Screw
Shell Upper
Remove Screws
Remove
Screws
5