Warranty Guide

10
Plank on the last row and the first row must be in
a minimum width of 2” (50mm).
Remember to include expansion gap of ½” from
the wall.
Cut the panels lengthwise and glue the short
ends.
Complete installation with moldings. Any
molding must be fixed to the wall, never to the
floor.
The final planks should be installed the same
way as the 1
st
plank.
You may have to rip the last row lengthwise to
leave ½” for the expansion joint.
Complete installation with moldings.
GLUE DOWN INSTALLATION
EZ Click flooring can be glued directly to a concrete sub-floor, wooden sub-floor, or terrazzo on the
ground floor and/or second floor. EZ Click flooring must not be installed over any type of vinyl; any
vinyl must be removed. Sub-floor must be free of wax, paint, oil and debris. Terrazzo floors must be
cleaned and stripped of all polishes.
Recommended tools:
1. Moisture Meter
2. BOSTIK’S BEST or equivalent moisture-cured urethane adhesive
3. Bostik MVP4® Moisture Vapor Protection (if required)
4. Notched Trowel-- follow Glue Manufacturer’s guidelines for recommended size
5. Bostik’s Ultimate Adhesive Remover or wipes
6. Guide Strip
7. Chalk reel
8. Tape measure
9. Speed square
10. Flooring straps
11. 100 lb Roller
12. Electric saw OR Hand saw