User's Manual

Table Of Contents
Street Light Bridge Integrator’s Guide 59
Commission
Status
Indicates whether the device has been commissioned. The
values that can appear in this field and their colors depend on
whether the device has successfully been installed (black), is
being installed (orange), or has an error (red).
Black (Installed)
Commissioned. The device has successfully been
installed.
Orange (Installation in Progress)
Pending Commission. The SmartServer has identified
that it needs to commission the device.
Pending Download. The SmartServer has been
instructed to download an application image to the
device.
Never Reached. During the initial installation attempt,
the device has not received messages from the
SmartServer.
Red (Error)
Commission Error. The device has not been
commissioned. Most likely this state is a result of a
communication failure, but it could also be caused by a
device failure.
Download Error. An application image has not been
downloaded to the device. Most likely this state is a
result of a communication failure, but it could also be
caused by issues such as the device having the wrong