User's Manual

Table Of Contents
86 Controlling a Street Lighting Network
root/lonworks/types folder, expand the bas_controller folder,
select the user-defined functional profile template (UFPT) for the
Scheduler, enter a name for the functional block such as
“Scheduler 1”, and then click OK.
5. A calendar view for the current date opens.
6. Optionally, you can select the Restrict Effective Period checkbox to
configure the period of time for which the Event Calendar and Event
Scheduler are active, respectively. By default, both are active for a 37-
year period starting on January 1, 2000 and ending December 31, 2037.
To configure a different effective period, specify the Start Date and Stop
Date. If you clear the checkbox, the default 37-year effective period is
used.
7. By default, the Suppress Event Recovery checkbox is cleared. Clearing
this checkbox means that the Scheduler executes the next scheduled
event when the SmartServer reboots, the system time changes, or a data
point’s priority is reset at the end of a one-time exception. This option
enables the SmartServer to maintain the current value stored in the data
point if the data point is overridden by another application. Selecting the
checkbox allows the Scheduler to attempts to restore the values and
priorities of the selected input points by searching for the most recent
past event and executing it.
The Scheduler exclusively determines the value of each selected input
point (as long as it has the highest priority assigned to the data point).
8. Click Submit.