User's Manual

F9, F9 Express Fetal & Maternal Monitor User Manual FTS-3 Fetal Telemetry System
- 118 -
11.2 Installation Guide
WARNING
The system installation should be operated by serviceman authorized by the
manufacturer.
11.2.1 Opening the Package and Checking
Visually examine the package prior to unpacking. If any signs of mishandling or damage are
detected, contact the carrier to claim for damage.
Open the package; take out the base station and accessories carefully. Keep the package for
possible future transportation or storage. Check the components according to the packing list.
Check for any mechanical damage.
Check all the cables and accessories.
If there is any problem, contact us or your local distributor immediately.
11.2.2 Installing Battery
WARNING
Switch off FTS-3 and unplug it before installing or removing the battery.
NOTE:
1 If the system is provided with a rechargeable base station battery, please charge the
battery after each transportation and storage.
2 Please charge the battery to the full after each use. When the system is powered on
with the AC power supply, the battery is charging. Please do not interrupt the
charging and wait until the battery is fully charged.
If the system is provided with a rechargeable lithium-ion battery, follow these steps to install the
battery:
(1) Battery Installation
a) Place FTS-3 upside down on a flat surface covered with cloth or another type of protecting
pad.
b) Remove the screws of the battery compartment using a cross-head screw driver. Remove the
battery compartment cover.