Installation manual

Commissioning
Commissioning protocol
19
Commissioning Protocol R600
Project
Boiler type Project
Serial number Address
Year City
Nominal load (Hi) [kW] Date
Nominal output (Hi) [kW] Engineer
System
Water pressure [bar] Installation:
Roof top
Water pH [-] Ground floor
Water hardness [dºH] Basement
Water chloride [mg/l] Other: .........................
Water T full load [ºC] Low velocity header
Water p
boiler
[kPa] Plated heat exchanger
Water flow [m
3
/h] Bypass boiler
Pump setting [-] Other: .........................
Safety devices
High limit setting [ºC] Water flow sensor checked
Temp. limiter setting [ºC] Fluegas sensor checked
Min. gas pressure switch setting [mbar] Water flow switch checked
Ignition time burner [sec]
Combustion analysis
100% load 50% load Min. load
Gas consumption [m
3
/h] [m
3
/h] [m
3
/h]
Gas pressure [mbar] [mbar] [mbar]
CO
2
[%] [%] [%]
O
2
[%] [%] [%]
CO [ppm] [ppm] [ppm]
NOx [ppm] [ppm] [ppm]
T
atmospheric
[ºC] [ºC] [ºC]
T
fluegas
[ºC] [ºC] [ºC]
T
water, flow
[ºC] [ºC] [ºC]
T
water, return
[ºC] [ºC] [ºC]
Ionisation current [µA] [µA] [µA]
p
fan
[mbar] [mbar] [mbar]
p
top panel
[mbar] [mbar] [mbar]
p
combustion chamber
[mbar] [mbar] [mbar]
Parameter settings
P1 Setpoint temperature heating [ºC] P12 Boiler hysteresis [ºC]
P2 Setpoint temperature DHW [ºC] P17 Fan speed min. load [%]
P11 Maximum boiler setpoint [ºC] P19 Fan speed 100% load [%]
Remarks
Hydraulics: