|nstallafion Remote Blower Assembly |nstrucfions for Telescoping (I600cfm) Downdraft Electrolux Ventilation System
Fin ing Information Table of contents Please read & save this guide Finding Information ................................................. 2 Important Safety Instructions .................................. 3 Shipping Pack ......................................................... Dimensions ............................................................. 5 6 Planning .................................................................. 7 Installation of Blower Assembly ..............................
iiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiii important Safety instructions ...... 3 Wh at yo u need to know a bo ut sa fe ty inst r uctio ns iiiiiiiiiiiiiiiiiiiiiiiiii Warning and Important Instructions appearing in this guide are not meant to cover all possible conditions and situations that may occur.
important Safety instructions TO REDUCE THE RISK OF iNJURY TO PERSONS IN THE EVENT OF A RANGE TOP GREASE FIRE, OBSERVE THE FOLLOWING*: SMOTHER FLAMES with a close-fitting lid, cookie sheet, or metal tray, then turn off the burner. BE CAREFUL TO PREVENT • For general ventilating use only. Do not use to exhaust hazardous or explosive materials and vapors. • To reduce risk of fire and to properly exhaust air, be sure to duct air outside.
i in Pack
mensions Specificat!ns_ _ = Remote and Dimensions Blower Dimensions 19-3/4" Electrical Conduit Zonnection (so.2cm) ,\ 19-5/8" (49.8cm) \_ , Main Blower \\ Housing 16-15/16" (43 cm) \\ Air Inlet - 10-5/16" (26.2 cm) Duct 10" 8-3/16" (20.8 cm) [ \\\ _'y"'_'_HHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHH_;;_ 2-15116" (7.5 cm) \\ I _,, 9-13/16" (24.9 cm) 6-15/16" (17.6 cm) 12-13/16" o o (32.5 cm) I/ / \,\ i \\ \ 1 \ \\ \ I \\ X 30-5/8" / \ (77.8cm) Blower Cover / \ _10"
Planning IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII Installation Ductwork Planning A qualified technician must complete the installation of this appliance. Carefully check the location where the remote blower is to be installed. The remote blower should be placed for convenient access. Make certain that electrical power can be provided in the selected location. The Remote Blower can be installed in various locations.
Installation of lower Assembly !!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!! Removethe BlowerCover Remove the Blower Cover from the Main Blower Housingbyremovingthe(16) silverhexheadscrews fromtheBIowerCover. Retainthescrews. RemovetheWire boxfromthe Main BlowerHousing ................................................................................ by removing the 3 hex head screws. Retain the screws.
When mounting the Main Blower Housing, the (4) lag bolts must be attached to joists or studs, or other structural members. When mounting the main blower housing between floor joists or walls studs, it is necessary to space the blower housing off the floor or wall using a minimum 2x4 wood spacer. The wood spacers should be properly secured to the joists or studs. DO NOT secure the wood spacers to the sub-floor or wall materials.
Installation on Floor Joists Lag Bolts must be attached to joists, studs or structural members. Conduit 1/4"Lag Bolts (4) - - . / Romex / Floor Joist F Flooring Discharge J 1/4" Lag Bolts (4) / ............
Insta on on Ceilin / Ceiling Joist Joists 1/4" Lag Bolts (4) ___________i:i_i_i_i_i_i_ \ \ \ \ Discharge \ \ \ _:_iiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiii \ \ Conduit / Romex Ceiling
Installation on all Studs Conduit / Romex \ \ \ \ \- 1/4" Lag Bolts (4) Discharge Wall Stud _i_i_i_i_i_i_i_i_i_i_i_i_i_i_i_i_i_i_i_i_i_i_i_i_i_i_i_i_i_i_i_i_i_i_i_i_i_i_i_i_i_i_i_i_i_i_i_i_i_i_i_i_i_i_i_i__!__________________________________________ iiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiii_i!iiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiii_ iiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiii
Installation on Exterior all i_i_i_i_i_i_i_i_i_i_i_ i_i_i_i_i_i_i_i_i_i_i_ he O Utdo o We a!h e rK! t W K-SP 36 0 is req u ired foro u tdoo r! nst a!lation: .............................................................................................. i_i_i_i_i_i_i_i_i_i_i_ i_i_i_i_i_i_i_i_i_i_i_ Outdoor Weather Kit i_i_i_i_i_i_i_i_i_i_i_ .........
Electrical Connections Remote Blower Electrical Connection Loosen the 3 terminal block screws, insert the leads from the Romex cable into the terminal block and tighten the screws securing the leads in the terminal block. Make the required electrical connections according to the wiring diagram. Re-attach the Wire Box using 3 screws. DOWNDRAFT BLOWERHOUSING Capacitor CONTROLBOX I BRN P8 Pll BLK I WHT I BLU GRN GRN CONTROLBOARD 1.
Verifying Operation and Verifying placing Cover Proper Operation After making the required electrical connections, confirm proper operation of the blower. 1. Temporarily re-install the remote blower cover, using 2 screws per side. 2. Turn on the power supply at the circuit breaker. 3. Refer to the Telescoping Down Draft Installation Instructions for additional instructions on proper operation.
Warranty Your appliance is covered by a one year limited warranty. For one year from your original date of purchase, Electrolux will repair or replace any parts of this appliance that prove to be defective in materials or workmanship when such appliance is iiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiii installed, used, and maintainedinaccordancewiththeprovided instructions.